4.0 Employability Plan

Contractors must create an Employability Plan (EP) for all individuals enrolled in the Program. Participants must have an EP at all times. Contractors must record EPs in WWP except in cases where the Contractor is unable to access WWP (e.g., lack of internet access, no laptops permitted in a correctional facility). In such cases, Contractors may develop a paper EP and must enter the EP in WWP within 30 days. Contractors must review the EP with the individual, give the individual the opportunity to sign the EP, and provide them with a copy of the completed EP. Individuals must cooperate with and follow their EPs throughout the Program duration. Contractors must scan all EPs into ECF (see 2.8).

 

 

History: There are no previous versions of this policy.